Construction requires factory-level output in constantly changing conditions. Yet execution is still managed manually and reactively. BrixSight delivers a complete AI-powered platform for construction execution: real-time progress tracking, automated planning, delay detection, and budget control across all your projects.
Est. Completion: 05/05/2030 (+157 Days Delay)
Which contractors are behind schedule?
Our platform's AI layer continuously processes your project data. Tracking progress, adjusting schedules, detecting risks, and surfacing actionable insights across all your projects.
Continuous performance measurement, deviation detection, delay forecasting, and real-time recovery planning.
Automated task activation, contractor coordination, and process sequencing driven by real execution progress.
Enforcing operational standards and ensuring stage completion before moving forward.
Turning the BIM model and project data into real-time insights and operational actions.
Advanced tools that connect BIM, schedules, and field reality — turning live data into continuous execution control.
Control the execution timeline with automated schedule setup, real-time progress tracking, delay forecasting, and effort optimization across all work stages.
Query the BIM model with natural language to extract element lists, detect design conflicts, and generate RFIs — turning the 3D model into an active execution tool.
Manage operational tasks, site activities, and procurement flows while automatically generating structured daily reports and weekly progress summaries.
11/02/2026
Create, assign, and track punch list items with photo documentation, contractor notifications, and a complete verification workflow — all from WhatsApp or the dashboard.
5 items · Elite Tiling
Cracked tile — Floor 3 lobby
Elite Tiling
Missing sealant — Window frame B4
ProSeal Ltd
Paint scratch — Stairwell wall
ColorMax
Drainage slope issue — Balcony 2A
AquaFlow
Door alignment off — Unit 305
WoodCraft
Forecast and control project cash flow by comparing planned costs with actual spending, validating contractor payment requests, and tracking financial deviations in real time.
Total Budget
₪1.9M
Spent
₪1.33M
Remaining
₪570K
Variance
-₪320K
See how the platform replaces manual management layers across every critical operational scenario.
Delays discovered after progress has already diverged. Schedule updated manually after a weekly meeting.
Deviation detected in real time. Critical path impact calculated. Recovery plan generated. Schedule adjusted automatically.
Performance measured retroactively. EVM deviations found only after a significant gap has formed.
Continuous measurement. Early deviation detection. Future impact forecasted. Acceleration scenarios generated.
Coordination done via phone calls and messages. No structured record of arrival confirmation.
Task dependency met. Summon sent automatically. Confirmation recorded. Schedule updated accordingly.
Task marked as completed without built-in verification. Readiness checks done manually.
Readiness checklist triggered automatically. On-site verification performed. Only after approval — next stage unlocked.
Project data scattered. Quantity extraction done manually. RFIs written and managed via email.
Natural language query on BIM model. Execution data analyzed. Quantities extracted. RFI draft generated. Full lifecycle management.
A continuous cycle of monitoring, analysis, and execution control.
Turn daily site activity into clear schedule control. Detect hidden delays early, hold subcontractors accountable, to maintain and increase project profitability.
Protect your margins. Avoid financing costs and delivery penalties by spotting pace deviations early.
Protect the client, protect the budget, and protect the schedule. Maintain strict control and deliver projects with certainty.
Real-time tracking, AI-powered analytics, and automated planning. All in one platform.
We use optional cookies to understand visits and show more relevant BrixSight advertising.